-
-
-
- Requirements
-
-
-
+91-9999-241-423info@mywastesolution.com
Get Listed and Grow Your Business
Know More
Consultancy Requirement Detail
consultant needed for biofeul plant
Requirement Description:
Working and payment terms are being managed by mywastesolution.com for this requirement. Client wants set up following plants and is looking for a company that can take care of entire project from feasibility, project report to entire installation and setup. Plant location could be anywhere in India depending on the feasibility. Below are the plant details.
- Ethanol Plant
- Capacity: Starting from 5 KL.
- Requirements: Grain-based production only.
- Pyrolysis Plant
- Capacity: Starting from 5 tons.
- Requirements: Continuous process, capable of processing both plastic and tyre feedstock.
- Waste Engine Oil to Hydraulic Oil Plant
- Capacity: Starting from 5 tons.
- Requirements: Batch and continuous processes.
- CBG/CNG Plant
- Capacity: Starting from 2.4 tons.
- Biodiesel Plant
- Requirement: A new Re-boiling process is required.
- Waste Petroleum Oil Plant
- Requirements: Final output should be colourless and odourless, with sulphur content reduced to a maximum of 10 ppm.
Posted By:
Name: sahil sanwal
View contact details of sahil sanwal
To work on this requirement click on place bid button
Place Bid
Get Listed and Grow Your Business
Know More